QUALITY ASSURANCE:

We adhere and review checklists for every project throughout the production process.

Quality Assurance Checklist:

Control Panels, PLC Controllers, Pneumatics

​

  • All different currents segregated or separated as needed.

  • Check proper wire size for different Amp ratings.

  • Check all circuit breakers for proper Amperage, per schematics.

  • All circuit breakers checked for proper function.

  • All fusing meets schematic requirements.

  • All different voltages are properly color coded, per requirements.

  • All terminal blocks sized appropriately.

  • Check all power supplies for proper wiring and current.

  • Check that all PLC cards are properly installed and wired. (If PLC Controller is installed.)

  • Any/All Fan units installed and operating correctly.

  • Exterior Cooling Devices are properly gasketed and secured.

  • Pneumatic devices properly tubed.

  • Ensure Air Filter is properly installed.

  • Ensure all Air Regulators are properly installed.

  • All necessary warning labels are correctly placed.

  • Complete continuity check performed.

  • Ensure overall appearance is clean and dirt free.

Quality Assurance Checklist:

Disconnect, Motor Starter, VFD Panels

​

  • All Contactors rated for designated Motor Voltage and HP.

  • All Overloads rated for proper FLA

  • Field Terminal Blocks rated for proper FLA. (If overloads are tied to terminal blocks.)

  • All fusing properly sized for contactor protection and field motor protection.

  • VFDs sized to meet field motor, HP phasing, and FLA.

  • VFDs properly protected with correct fusing.

  • Disconnect is properly sized to meet overall voltage and horsepower.

  • Disconnect handle properly installed.

  • All disconnect linkages work properly. (Including lockout device and disconnect defeater.)

  • Transformer wired per stated voltage on schematics. (Both primary and secondary.)

  • All wiring properly sized per Amp ratings listed on schematics.

  • All duct wires are cleanly placed.

  • All necessary warning labels are correctly placed.

  • Exterior Cooling Devices are properly gasketed and secured.

  • Complete continuity check performed.

  • Ensure overall appearance is clean and dirt free.